Ashorne Hill training centre is based in a listed building in the Warwickshire countryside. In the 1950s and 60s the original house had a number of CLASP system additions and piecemeal additions thereafter. The feasibility project was to look at joining the disparate elements together and where possible reusing the CLASP framework and re-cladding it, reorganising the interior and rejuvenating the buildings to make them appropriate to the centre's needs, a modern way of working, training and socialising; and a building aesthetic that would sit well alongside the listed historic buildings. Nick was solely responsible for the feasibility study whilst at adp.
Go back to the portfolio here
All images produced by Nick.